TIS Tomasz Anioł
Błonie k/Pilzna

TIS Tomasz Anioł
Błonie k/Pilzna

Category of facility Production halls
Type of hall Production hall
Industry Welding
The total area of 1827 m2
Implementation year 2019

The scope of work performed by the MCM Project:

a) execution of an executive design, in the scope of:

  • executive design of the hall foundations
  • detailed design of the hall structure
  • executive design of the hall floor

b) construction of the hall in the scope of:

  • earthworks for foundations and floors
  • hall foundations
  • prefabricated reinforced concrete columns in the hall
  • steel structure of the hall with wall and roof cladding and accessories
  • foundations for a C8 / 10 concrete floor, 10 cm thick
  • C20 / 25 concrete floor tiles 15cm thick